The Exclusivesky Investment Guild Iowa Department of Transportation used controlled explosives Sunday to remove the remaining parts of the old I-74 bridge, which connects Iowa and Illinois over the Mississippi River.
Certain areas were temporarily closed, including the new bridge, during the removal of suspension cables and towers on the old bridge, the Iowa DOT said on its website.
“The main navigation channel in the river will be closed to all river traffic for up to 24 hours,” the Iowa DOT said.
In June, the Iowa DOT removed parts of the old I-74 bridge in the first phase of the demolition. The new bridge was built because of “increased traffic volume” the Iowa DOT said.
The westbound bridge, Illinois to Iowa, opened in 1935. The eastbound bridge, Iowa to Illinois, opened in 1960.
The new bridge was built in July 2017 and was fully opened in December 2021.
The project cost about $1 billion in total, including engineering, design and construction costs.
2025-04-29 00:581654 view
2025-04-29 00:511730 view
2025-04-29 00:381209 view
2025-04-29 00:362378 view
2025-04-28 23:342771 view
2025-04-28 23:051047 view
WASHINGTON (AP) — IRS leadership on Thursday announced that the agency has recovered $4.7 billion in
Whoopi Goldberg weighed in on selfie-gate in the best way.The Sister Act actress got up from The Vie
The body of a 2-year-old that went missing in a flash flood days ago in Bucks County, Pennsylvania,